(1)2008.3-2008.5
2000M piping installation of module 4P, MODEC project; client: COOEC (Qingdao)
(2)2008.4-2008.6
2000M piping installation of module 2PW, MODEC project; client: COOEC (Qingdao)
(3)2008.7-2008.9
10 Skids prefabrication and installation of BZ28-2S project;
(4)2008.9-2008.11
15 Skids overall assembly and installation of JZ25-1S project;Client: COOEC(Qingdao)
(5)2008.8-2009.4
6000M piping offshore and onshore installation of WHPA & WHPB, BZ28-2S project; client: COOEC (Qingdao)
(6)2008.8 -2009.9
4000M piping prefabrication and installation of module AS & BR, MODEC-PY project; client: COOEC (Qingdao)
(7)2008.10-2009.6
5000M carbon steel piping prefabrication and installation of WHPA, LD32-2 project; client: COOEC (Qingdao)
(8)2008.12-2009.2
Over 100tons cap support prefabrication of module 3M131, kanianbo nikel project; client: COOEC (Qingdao)
(9)2009.2 -2009.4
50tons turbine operation platform prefabrication JZ25-1project; client: COOEC (Qingdao)
(10)2009.3 -2009.7
65 pieces of Equipment installation and commissioning, MODEC PB-GASⅡ; client: COOEC (Qingdao)
(11)2009.4-2009.5
106tons deck and operation platform prefabrication of LD PSP platform; client: COOEC (Qingdao)
(12)2009.4-2009.8
3000M piping prefabrication and installation of module 4P, MODEC PB-GASⅡ project; client: COOEC (Qingdao)
Part of piping prefabrication and installation of of module CEP, JZ25-1project; client: COOEC (Qingdao)
(13)2009.6-2009.7
The water piping refrigerant of JZ25-1project; client: COOEC (Qingdao)
1300M piping prefabrication and installation of module WHPA, LD32-2/27-2 project; client: COOEC (Qingdao)
Piping installation of module WHPA/WHPB, LD32-2/27-2 project,and SZ36-1 project;client:COOEC (Qingdao)
(14)2009.6-2009.8
The later work:Equipment、piping and electrical instruments about skid ,JZ25-1project;client:COOEC(Tianjin)
(15)2009.3-2009.8
3000M piping prefabrication and installation of module 3S&3PW, MODEC PB-GASⅡ project; client: COOEC (Qingdao)
(16)2009.8-2010.2
4900M(Special material) piping prefabrication and installation of module CEPK,SZ36-1 project; client: COOEC (Qingdao)
Well piping prefabrication and installation of SZ36-1 project; client: COOEC (Qingdao)
(17)2009.11-2010.8
Piping prefabrication and installation of D-025&M-035 and Drilling ship project;client:Penglai Jutal Offshore Engineering Heavy Industries,Co.,Ltd
(18)2009.12-2010.4
Piping prefabrication and installation of JZ25-1\JX1-1 project and 200Feet Drilling ship extra project; client: COOEC (Qingdao)
1000M piping prefabrication and installation of module Living building, JX1-1 project; client: COOEC (Qingdao)
1100M piping prefabrication and installation of POLYSIUS, Nickel ore project; client: COOEC (Qingdao)
(19)2010.1-2010.8
Piping prefabrication and installation of module 3M103/203/104/204, Nickel ore project; client: COOEC (Qingdao)
(20)2010.6-2010.7
Sea maintenance of module Kuidong101/2/103 production and Hainan24# production; client: Sinopec Group(Qingdao)
(21)Since 2010.7
36000Tons Block and piping prefabrication and installation of bulk ship; client: Rizhao huahai great shipbuilding Co., LTD
(22)since 2010.8
Piping prefabrication and installation of B90 project and PLV project; client: Yantai CIMC Raffles
Block engineering; client: Yantai CIMC Raffles
(23)Outfitting engineering
In2008,17500Tons Russian outfitting; client:Xingang Shipyard.
Since 2008-2009,37600Tons South Africa outfitting; client:Xingang Shipyard.
In2009,14000Tons Russian outfitting; client:Xingang Shipyard.
In2008,outfitting of BZ28-1 project; client:COOEC(Yantai)
In2009,outfitting of BZ34-1 project; client:COOEC(Yantai)
In2010,outfitting of module CEPA,JX1-1 project; client:COOEC (Qingdao)
In2010, outfitting of module Living building, 200Feet Drilling ship project; client:COOEC (Qingdao)