Main business performance
Projects :

  (1)2008.3-2008.5

  2000M piping installation of module 4P, MODEC project; client: COOEC (Qingdao)

  (2)2008.4-2008.6

  2000M piping installation of module 2PW, MODEC project; client: COOEC (Qingdao)

  (3)2008.7-2008.9

  10 Skids prefabrication and installation of BZ28-2S project;

  (4)2008.9-2008.11

  15 Skids overall assembly and installation of JZ25-1S project;Client: COOEC(Qingdao)

  (5)2008.8-2009.4

  6000M piping offshore and onshore installation of WHPA & WHPB, BZ28-2S project; client: COOEC (Qingdao)

  (6)2008.8 -2009.9

  4000M piping prefabrication and installation of module AS & BR, MODEC-PY project; client: COOEC (Qingdao)

  (7)2008.10-2009.6

  5000M carbon steel piping prefabrication and installation of WHPA, LD32-2 project; client: COOEC (Qingdao)

  (8)2008.12-2009.2

  Over 100tons cap support prefabrication of module 3M131, kanianbo nikel project; client: COOEC (Qingdao)

  (9)2009.2 -2009.4

  50tons turbine operation platform prefabrication JZ25-1project; client: COOEC (Qingdao)

  (10)2009.3 -2009.7

  65 pieces of Equipment installation and commissioning, MODEC PB-GASⅡ; client: COOEC (Qingdao)

  (11)2009.4-2009.5

  106tons deck and operation platform prefabrication of LD PSP platform; client: COOEC (Qingdao)

  (12)2009.4-2009.8

  3000M piping prefabrication and installation of module 4P, MODEC PB-GASⅡ project; client: COOEC (Qingdao)

  Part of piping prefabrication and installation of of module CEP, JZ25-1project; client: COOEC (Qingdao)

  (13)2009.6-2009.7

  The water piping refrigerant of JZ25-1project; client: COOEC (Qingdao)

  1300M piping prefabrication and installation of module WHPA, LD32-2/27-2 project; client: COOEC (Qingdao)

  Piping installation of module WHPA/WHPB, LD32-2/27-2 project,and SZ36-1 project;client:COOEC (Qingdao)

  (14)2009.6-2009.8

  The later work:Equipment、piping and electrical instruments about skid ,JZ25-1project;client:COOEC(Tianjin)

  (15)2009.3-2009.8

  3000M piping prefabrication and installation of module 3S&3PW, MODEC PB-GASⅡ project; client: COOEC (Qingdao)

  (16)2009.8-2010.2

  4900M(Special material) piping prefabrication and installation of module CEPK,SZ36-1 project; client: COOEC (Qingdao)

  Well piping prefabrication and installation of SZ36-1 project; client: COOEC (Qingdao)

  (17)2009.11-2010.8

  Piping prefabrication and installation of D-025&M-035 and Drilling ship project;client:Penglai Jutal Offshore Engineering Heavy Industries,Co.,Ltd

  (18)2009.12-2010.4

  Piping prefabrication and installation of JZ25-1\JX1-1 project and 200Feet Drilling ship extra project; client: COOEC (Qingdao)

  1000M piping prefabrication and installation of module Living building, JX1-1 project; client: COOEC (Qingdao)

  1100M piping prefabrication and installation of POLYSIUS, Nickel ore project; client: COOEC (Qingdao)

  (19)2010.1-2010.8

  Piping prefabrication and installation of module 3M103/203/104/204, Nickel ore project; client: COOEC (Qingdao)

  (20)2010.6-2010.7

  Sea maintenance of module Kuidong101/2/103 production and Hainan24# production; client: Sinopec Group(Qingdao)

  (21)Since 2010.7

  36000Tons Block and piping prefabrication and installation of bulk ship; client: Rizhao huahai great shipbuilding Co., LTD

  (22)since 2010.8

  Piping prefabrication and installation of B90 project and PLV project; client: Yantai CIMC Raffles

  Block engineering; client: Yantai CIMC Raffles

  (23)Outfitting engineering

  In2008,17500Tons Russian outfitting; client:Xingang Shipyard.

  Since 2008-2009,37600Tons South Africa outfitting; client:Xingang Shipyard.

  In2009,14000Tons Russian outfitting; client:Xingang Shipyard.

  In2008,outfitting of BZ28-1 project; client:COOEC(Yantai)

  In2009,outfitting of BZ34-1 project; client:COOEC(Yantai)

  In2010,outfitting of module CEPA,JX1-1 project; client:COOEC (Qingdao)

  In2010, outfitting of module Living building, 200Feet Drilling ship project; client:COOEC (Qingdao)